|
The Project passes through the states of Gujarat, Maharashtra and the Union Territory of Dadra & Nagar Haveli with 12 stations planned at Mumbai, Thane, Virar, Boisar, Vapi, Billimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad and Sabarmati. |
|
The Project passes through the states of Gujarat, Maharashtra and the Union Territory of Dadra & Nagar Haveli with 12 stations planned at Mumbai, Thane, Virar, Boisar, Vapi, Billimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad and Sabarmati. |
|
Since there would be fewer cabs on the road, the surge pricing is likely on Ola, Uber, and Rapido. It would lead to longer wait times, ride cancellations expected, especially during peak hours and at airports and railway stations. Know who will be affected. |
|
Thane: A court in Maharashtra's Thane district on Monday reserved its order till May 21 in a 2008 case related to the alleged assault on Railway Recruitment Board examinees at Kalyan station by Maharashtra Navnirman Sena activists. |
|
The country's first bullet is under manufacturing at the Bengaluru-based BEML, and is expected to be ready by 2027. | India News |
|
"It is a representational image and not the final one," a senior official said. |
|
Bengaluru: Hoodi railway halt, a key suburban station in east Bengaluru catering to short-distance Memu services, has been temporarily shut as part of the ongoing railway line quadrupling project between Whitefield and Cantonment. |
|
A picture of the high-speed train has been installed at Gate Number 4 of the Ministry of Railways building. The display showcases the design of the train. |
|
The Union Railway Ministry marked a major infrastructure milestone by displaying the first official look of the high-speed Shinkansen-style bullet train at its New Delhi headquarters. |
|
The Indian Railways has revealed the design of the country's first bullet train, part of the high-speed rail project connecting Mumbai and Ahmedabad., India News, Times Now |
|
Indian Railways unveils design of country's first bullet train for Mumbai-Ahmedabad corridor. Project includes 12 stations, 280 kmph trains, and Make in India initiative |